Fully equipped interim accommodation with, among other things, specialist room equipment for biology, physics, chemistry, work rooms, kitchen lessons, music rooms, BMA, ELA, IT, lift system and much more.
Due to the poor and energetic condition, the 45-year-old school will be completely renovated. At the same time, RECON built an independent modular school building, which represents an equivalent replacement for the approximately two-year construction period.
In addition to the general classrooms, the three-story building complex also contains various specialist rooms for the different teaching areas. The generous outdoor areas and open design of the alternative school district ensure a high quality of teaching.