Energy standards according to OIB, accessible green roof, central water installation with flushing facilities, central VRF system, connecting corridor to the existing building, BMA, ELA, IT, and much more
As a replacement for a school that is currently being built, a temporary structure made up of school room modules was built on the Bernoulli ymnasium site. The upper floor is connected to the existing building by a corridor/connecting corridor.
The construction of the modular building was carried out by RECON as part of a general contracting service on behalf of BIG Bundesimmobiliengesellschaft GmbH and was definitely one of our highlight projects in 2022.